https://dailyhive.com/vancouver/seabus-flooding-waterfront-station-december-30-2021
By now, there should have been a Seabus sailing every 5 minutes in both directions. Of course that would mean ordering more of them to be built. At the same time, the city is so stubborn about building a transit tunnel or any new bridges that are actually wide enough to have bus & HOV lanes in general..