TTI is about, Architecture, AI, Engineering, IT, Transportation and Urban Tech in general
Wednesday, September 30, 2020
601-beach-crescent-vancouver
https://dailyhive.com/vancouver/601-beach-crescent-vancouver-rezoning-approval
55 stories, but it still should have been another 10-20 floors taller.
526-granville-street-office-tower
https://www.urbanyvr.com/526-granville-street-office-tower/
Too short, not 40, not 30, not even 25 stories.
broadway-commercial
https://www.urbanyvr.com/broadway-commercial-westbank/
Too small for a project next to 2 rapid transit lines.
the vancouver-office-market
https://dailyhive.com/vancouver/vancouver-office-market-q2-2020
Keep holding it back, as usual.
granville-bridge-connector-interim-design-approved
https://dailyhive.com/vancouver/granville-bridge-connector-interim-design-approved
A new bike and pedestrian bridge should have been built instead.
Monday, September 28, 2020
the-post-office-redevelopment
https://dailyhive.com/vancouver/amazon-the-post-office-redevelopment-lease
It really should be called, the Stump. Not 55, 45, 35 or even 25 stories. WTH?